Skip to main content
Purchasing announcements

Evaluation of the potential for repowering transmission lines in Peru

Start date
Finish date
Industry
Technology
Country
Peru flag
Peru

Description

The Inter-American Development Bank (IDB), in coordination with the Economic Operation Committee of the National Interconnected System (COES) of Peru, is calling on consulting firms to submit proposals to evaluate the technical, economic and regulatory potential of increasing transmission capacity on existing transmission lines through Grid-Enhancing Technologies (GET), such as Dynamic Line Rating (DLR) and conductor repowering.

1. Technology benchmark and broker diagnostics
GET benchmarking: Conduct an international benchmark on maturity, costs (CAPEX/OPEX), interoperability and lessons learned from technologies such as DLR and high-temperature conductors, identifying solutions applicable to the National Interconnected Electric System (SEIN).

Congestion diagnosis: Analyze the existing infrastructure based on the prioritized list of lines delivered by the COES, identifying operational restrictions, renewable energy discharges, non-supplied energy and bottlenecks.

Characterization of alternatives: Define technical repowering options for the candidate corridors (DLR, replacement with high-temperature conductors, second circuit or increase in voltage level).

2. Technical-economic, environmental and regulatory assessment
Cost-benefit analysis (TOTEX): Quantify and compare alternatives to conventional expansion projects using total cost indicators (CAPEX + OPEX), congestion cost reduction, and capacity increase.

Socio-environmental risks and easements: Identify conditioning factors in right-of-way strips, needs for the expansion of easements and environmental impacts that affect the viability of the interventions.

Regulatory framework and incentive scheme: Analyze the treatment of investments in GET within the planning and remuneration of transmission, defining operational recommendations for the Ministry of Energy and Mines (MINEM), Osinergmin and COES.

3. Installation strategy, roadmaps, and transfer
Service continuity: Evaluate assembly strategies considering the duration of service interruptions against the feasibility of executing live line work.

Roadmaps by corridor: Develop a detailed action plan for each prioritized line that consolidates the technical solution, costs, regulatory and socio-environmental aspects and the execution sequence.

Capacity Transfer: Train the COES technical team to integrate the TEG evaluation methodology into the periodic preparation of Peru's Transmission Plan.

Note: Interested companies should review the requirements on the BEO Bidder Portal.

Eligible countries

Argentina flag
Argentina
Bahamas flag
Bahamas
Barbados flag
Barbados
Belize flag
Belize
Bolivia flag
Bolivia
Brazil flag
Brazil
Chile flag
Chile
Colombia flag
Colombia
Costa Rica flag
Costa Rica
Dominican Republic flag
Dominican Republic
Ecuador flag
Ecuador
El Salvador flag
El Salvador
Guatemala flag
Guatemala
Guyana flag
Guyana
Haiti flag
Haiti
Honduras flag
Honduras
Jamaica flag
Jamaica
Mexico flag
Mexico
Nicaragua flag
Nicaragua
Panama flag
Panama
Paraguay flag
Paraguay
Peru flag
Peru
Suriname flag
Suriname
Trinidad and Tobago flag
Trinidad and Tobago
Uruguay flag
Uruguay
USA flag
USA
Venezuela flag
Venezuela
FOR INQUIRIES