Supply and installation of fibre optic cable-jcf & dcs high priority sites & mns agencies
Description
Implementation Objective
The objective is to supply, install, configure and migrate all live services from the existing MPLS core and aggregation sites to the equipment specified in the Bill of Quantities, and a specification to the extent that it provides the necessary connectivity between the intended sites traversing via the upgraded MPLS Backbone. The installer is required to update the existing network design document, and to provide detailed documentation relating to changes made to the network topology.
The contractor will:
- Supply and install all the equipment specified in the bill of quantities per designated functions.
- Install all the equipment specified in the bill of quantities and specification as per manufacturer’s instructions. All installations must be certified.
- Migrate the existing MPLS Core and Aggregation Sites to the designated equipment specified in the bill of quantities.
- Configure all the equipment installed with the provided IP address and information to establish services for the individual Customer Edge locations back to aggregation points and Data Centers over the GovNet MPLS Network.
- Develop and execute the quality plan for Installation, testing the deployed network components.
For more information visit the original publication.
Eligible countries
Argentina
Austria
Bahamas
Barbados
Belgium
Belize
Bolivia
Brazil
Canada
Chile
China
Colombia
Costa Rica
Croatia
Denmark
Dominican Republic
Ecuador
El Salvador
Finland
France
Germany
Guatemala
Guyana
Haiti
Honduras
Israel
Italy
Jamaica
Japan
Mexico
Netherlands
Nicaragua
Norway
Panama
Paraguay
Peru
Portugal
Slovenia
South Korea
Spain
Suriname
Sweden
Switzerland
Trinidad and Tobago
United Kingdom
Uruguay
USA
Venezuela
FOR INQUIRIES
Sign in