Pasar al contenido principal
Anuncios de compras

Consulting services in Climate-Resilient Coastal Management & Infrastructure

Opportunity's company
Inter-American Development Bank
Start date
Finish date
Industry
Servicios Públicos y de Gestión Ambiental
Country
Bahamas flag
Bahamas

Descripción

- Coastal zone lidar study: To provide an accurate topographic and bathymetric map and DEM of the coastal zone at the project site; to acquire high resolution aerial photography and orthorectified mosaicked imagery tiles of the project site. 2nd Quarter 2020

- Shoreline change study: To map historical shoreline positions along the coastline of the existing project site in order to classify the shoreline into geomorphic categories (e.g. eroding, stable, dynamic, accreting, etc.) to assist in decision making for integrated coastal risk management and climate change adaptation. 2nd Quarter 2020

- Sediment transport study: To provide an update baseline coastal process information that will allow them to address the risk of coastal erosion. 3 rd Quarter 2020

- Nearshore wave & current study: To provide an update of baseline coastal process information that will allow them to address the risk of coastal erosion. The two main factors contributing to coastal erosion are: on-going or accelerated coastal structure construction; and climate change impacts, specifically rising sea levels and increasingly severe operational and hurricane wave climates. 2nd Quarter 2020

- Coastal infrastructure asset inventory: To ascertain the current condition and residual life of the GOBH-owned coastal infrastructure assets – which should provide a definable baseline, against which future performance or deterioration can be measured. 3 rd Quarter 2020

-Environmental & social baseline studies: To establish an historical and current overview of the environmental features of the project site, inclusive of terrestrial, coastal and marine habitats and other parameters that can impact ecosystem health (e.g. salinity, sea temperatures); and Provide the Project Implementation Unit (PIU) with an update on the socioeconomic landscape of Junkanoo Beach-Long Wharf and surrounding neighborhoods, and the current and potential impact the project will have on them. 2nd Quarter 2020

- Engineering designs: To develop final engineering designs for Nassau Harbour east breakwater repair/ rehabilitation and Junkanoo Beach-Long Wharf shoreline stabilization. 4 th Quarter 2021 

Países que pueden participar

Argentina flag
Argentina
Austria flag
Austria
Bahamas flag
Bahamas
Barbados flag
Barbados
Bélgica flag
Bélgica
Belice flag
Belice
Bolivia flag
Bolivia
Brasil flag
Brasil
Canadá flag
Canadá
Chile flag
Chile
China flag
China
Colombia flag
Colombia
Costa Rica flag
Costa Rica
Croacia flag
Croacia
Dinamarca flag
Dinamarca
República Dominicana flag
República Dominicana
Ecuador flag
Ecuador
El Salvador flag
El Salvador
Finlandia flag
Finlandia
Francia flag
Francia
Alemania flag
Alemania
Guatemala flag
Guatemala
Guyana flag
Guyana
Haití flag
Haití
Honduras flag
Honduras
Israel flag
Israel
Italia flag
Italia
Jamaica flag
Jamaica
Japón flag
Japón
México flag
México
Países Bajos flag
Países Bajos
Nicaragua flag
Nicaragua
Noruega flag
Noruega
Panamá flag
Panamá
Paraguay flag
Paraguay
Perú flag
Perú
Portugal flag
Portugal
Eslovenia flag
Eslovenia
Corea del Sur flag
Corea del Sur
España flag
España
Surinam flag
Surinam
Suecia flag
Suecia
Suiza flag
Suiza
Trinidad y Tobago flag
Trinidad y Tobago
Reino Unido flag
Reino Unido
Uruguay flag
Uruguay
USA flag
USA
Venezuela flag
Venezuela
PARA CONSULTAS