Saltar para o conteúdo principal
Anúncios de compras

Consulting services in Climate-Resilient Coastal Management & Infrastructure

Opportunity's company
Inter-American Development Bank
Start date
Finish date
Industry
Serviços de Gestão de Concessionários e Ambiental
Country
Bahamas flag
Bahamas

Descrição

- Coastal zone lidar study: To provide an accurate topographic and bathymetric map and DEM of the coastal zone at the project site; to acquire high resolution aerial photography and orthorectified mosaicked imagery tiles of the project site. 2nd Quarter 2020

- Shoreline change study: To map historical shoreline positions along the coastline of the existing project site in order to classify the shoreline into geomorphic categories (e.g. eroding, stable, dynamic, accreting, etc.) to assist in decision making for integrated coastal risk management and climate change adaptation. 2nd Quarter 2020

- Sediment transport study: To provide an update baseline coastal process information that will allow them to address the risk of coastal erosion. 3 rd Quarter 2020

- Nearshore wave & current study: To provide an update of baseline coastal process information that will allow them to address the risk of coastal erosion. The two main factors contributing to coastal erosion are: on-going or accelerated coastal structure construction; and climate change impacts, specifically rising sea levels and increasingly severe operational and hurricane wave climates. 2nd Quarter 2020

- Coastal infrastructure asset inventory: To ascertain the current condition and residual life of the GOBH-owned coastal infrastructure assets – which should provide a definable baseline, against which future performance or deterioration can be measured. 3 rd Quarter 2020

-Environmental & social baseline studies: To establish an historical and current overview of the environmental features of the project site, inclusive of terrestrial, coastal and marine habitats and other parameters that can impact ecosystem health (e.g. salinity, sea temperatures); and Provide the Project Implementation Unit (PIU) with an update on the socioeconomic landscape of Junkanoo Beach-Long Wharf and surrounding neighborhoods, and the current and potential impact the project will have on them. 2nd Quarter 2020

- Engineering designs: To develop final engineering designs for Nassau Harbour east breakwater repair/ rehabilitation and Junkanoo Beach-Long Wharf shoreline stabilization. 4 th Quarter 2021 

Países elegíveis

Argentina flag
Argentina
Áustria flag
Áustria
Bahamas flag
Bahamas
Barbados flag
Barbados
Bélgica flag
Bélgica
Belize flag
Belize
Bolivia flag
Bolivia
Brasil flag
Brasil
Canadá flag
Canadá
Chile flag
Chile
China flag
China
Colômbia flag
Colômbia
Costa Rica flag
Costa Rica
Croácia flag
Croácia
Dinamarca flag
Dinamarca
República Dominicana flag
República Dominicana
Equador flag
Equador
El Salvador flag
El Salvador
Finlândia flag
Finlândia
França flag
França
Alemanha flag
Alemanha
Guatemala flag
Guatemala
Guiana flag
Guiana
Haiti flag
Haiti
Honduras flag
Honduras
Israel flag
Israel
Itália flag
Itália
Jamaica flag
Jamaica
Japão flag
Japão
México flag
México
Holanda flag
Holanda
Nicarágua flag
Nicarágua
Noruega flag
Noruega
Panamá flag
Panamá
Paraguai flag
Paraguai
Peru flag
Peru
Portugal flag
Portugal
Eslovenia flag
Eslovenia
Coréia do Sul flag
Coréia do Sul
Espanha flag
Espanha
Suriname flag
Suriname
Suécia flag
Suécia
Suíça flag
Suíça
Trinidade e Tobago flag
Trinidade e Tobago
Reino Unido flag
Reino Unido
Uruguai flag
Uruguai
USA flag
USA
Venezuela flag
Venezuela
PARA INFORMAÇÕES